PsychoBandito
New member
My idea:
Propose that in order to build the pipeline through Quebec, a concrete safety basin must be built the entire length. Alberta gets their line, and Quebec gets there low production concrete plants at 100%.
Propose that in order to build the pipeline through Quebec, a concrete safety basin must be built the entire length. Alberta gets their line, and Quebec gets there low production concrete plants at 100%.